Setting Up
2011 01 14
Untitled
from
Coc00n UofMFoA
on
Vimeo
.
A trial run setting up the cocoon structure at the university, followed by the lateral load testing of the structure. After the first load test, the rope tie backs were positioned lower, to the point of loading, to act more effectively.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment